0 CRIT
R1 Technology Campus · Tower A + Tower B

Command Center

SIMULATION MODE · last update 08:00:00
Building Load
1,480
kW active demand
Total Energy
1,482
MWh cumulative
UPS Online
19/20
3 in alarm · 1 offline
AHUs Running
10/12
21/24 cassette units on
VAV Active
21/24
3 closed
Critical Alarms
0
0 warnings · 4 offline

Building Health

Subsystem supervisory status

Electrical Systems
9/10 energized
HEALTHY
UPS Systems
19/20 online
CRITICAL
HVAC Systems
10/12 AHUs running
OFFLINE
Energy Monitoring
12 meters polled
HEALTHY
Network Communication
4 devices offline
WARNING
UPS Output
1,536kW
HVAC Load
273kW
Power Factor
0.990
Data Latency
42ms

Building Load Trend

Main incomer · active power

Active PowerMIN 1420.01AVG 1501.43MAX 1614.39kW
Apparent PowerMIN 1434.94AVG 1515.75MAX 1636.54kVA

UPS-09 · Power Flow

Tower A · Electrical Room 2

HEALTHYDRILL DOWN
UTILITY400 VINPUT BRKCLOSEDRECTIFIER80 ADC BUS532 VINVERTER169 kWBATTERY95% · 55 minSTATIC BYPASSREADYCRITICAL LOAD75% · 169 kWMODE: NORMAL · PF 0.95 · OUT 401 V / 50.03 Hz

AHU-01 · Air Handling

Tower A · L2

HEALTHYDRILL DOWN
RETURN AIR 29.4°CSUPPLY AIR 18.4°CFILTER 224 PaDAMPER 68%COOLING VALVE 67%FAN 90%AHU-01 · SETPOINT 18.0°C · AIRFLOW 11,867 m³/h · RUNNING